Richmond
Asbestos and hazardous materials abatement in Richmond
In Richmond, Bulletin BUILDING-56 requires a Hazardous Materials Declaration signed by a qualified professional at building permit submission for demolition or renovation of buildings built before 1990, or where hazardous materials may be present, plus an inspection report and a post-abatement clearance letter. Bowfinn carries out the licensed asbestos abatement between those two reports.
- Occupied facilitiesContained work areas, phasing planned with you to limit disruption
- UA Local 170Signatory contractor
- Trained and certified crewsOn every asbestos abatement job
- InsuredInsurance certificates available on request.
Travel: Richmond projects are served from our New Westminster office.
What is Richmond's Bulletin BUILDING-56 and when does it apply?
The bulletin (dated 2024-02-01, revised 2025-07-23) covers buildings constructed before 1990 or where hazardous materials may be present through activities or operations in the building (City of Richmond).
What documents does Richmond need, and when?
- At building permit submission: a Hazardous Materials Declaration signed by a Qualified Professional
- A Hazardous Materials Inspection Report prepared by a qualified person
- ACM safely contained or removed
- A Post-Abatement Inspection Report (clearance letter)
The bulletin also reminds applicants to post the Notice of Project at the worksite for the project's duration.
What happens if the inspection report isn't on site?
A City inspector may ask for the inspection report before or during inspections, and if it cannot be produced may refuse the inspection and issue a Stop Work Order (City of Richmond).
Services in Richmond
Richmond FAQs
Does BUILDING-56 apply to a building built after 1990?
It can, if hazardous materials may be present through activities or operations in the building. Ask the City about your specific case (City of Richmond).
Who signs Richmond's Hazardous Materials Declaration?
A Qualified Professional, at building permit submission (City of Richmond).
Can a Richmond inspector stop work over a missing report?
Yes. The bulletin says an inspector may refuse the inspection and issue a Stop Work Order if the report cannot be produced.
General information, not legal advice. Requirements depend on your project; confirm with WorkSafeBC, your municipality or a qualified professional.
Planning work in an older building?
Book a Site Consultation and we'll walk the scope, the schedule and the building with you.